想了解更多關(guān)于產(chǎn)品、案例等信息,請(qǐng)輸入關(guān)鍵詞進(jìn)行搜索
總部地址:廣州市番禺區(qū)天安節(jié)能科技園總部中心11號(hào)樓
制造基地:肇慶市高新技術(shù)產(chǎn)業(yè)開(kāi)發(fā)區(qū)港南街2號(hào)
電話(huà):400-9913-833
傳真:020-34832618
郵箱:info@pkwater.com
廣州第一棉紡廠(chǎng)中水回用系統(tǒng)
水源為廣州市第一棉紡廠(chǎng)印染廢水綜合廢水處理站的達(dá)標(biāo)排放水,主要污染物有:TDS、COD、SS、硬度、色度、氨氮等,采用砂濾+反滲透+軟化的處理工藝,處理能力為2000T/D,2007年10月投入運(yùn)行,出水效果完全達(dá)到設(shè)計(jì)要求,產(chǎn)品水回用于車(chē)間生產(chǎn)線(xiàn)。
Reclaimed water reuse system in Guangzhou First Cotton Mill
The water source is the textile printing and dyeing waste water that meets the discharge standard from the integrated waste water treatment stationin the factory. The major pollutants are TDS, COD, SS,NH3-N,hardness,and colror,etc. Utilized the process of quartz sand filtration,activated carbon filtration,RO and softening treatment. The treatment capacity is 2000T/D.The system was put into operation in Oct 2007. The effluent quality has fully reached the design requirements, and the product water is recycled to the production line in theworkshop.